Allerton Carriage House and Artisan Village
Project Summary
Under the care of the University of Illinois Urbana-Champaign, the Allerton Estate in Monticello, Illinois has been transformed into a public park; its buildings used for education and research purposes. Originally designed as a stable and conservatory, the mansion’s two-story Carriage Wing today serves as a multi-purpose event space and lodging. The Car Shop and Extension, supporting buildings to the estate’s National Register nomination, will provide further space for future art programming. To explore necessary repairs, upgrades, and reuse alternatives supporting future growth in programming and capacity for the historic facility, Bailey Edward prepared a feasibility study in line with the Park’s master plan. The results provide the University with options appropriate for the buildings’ historic status on the National Register of Historic Places and associated costs for Allerton Park’s next era, including graphics for fundraising and communications.
client
University of Illinois Urbana-Champaign
location
Monticello, Illinois
size
14,153 sf
Services
Specialties
client
University of Illinois Urbana-Champaign
location
Monticello, Illinois
size
14,153 sf
Services
Specialties

Through engagement with stakeholders, together we identified the following space use needs of the Carriage House:
- Lobby entry for guests / visitors and pre-function space
- Catering preparation, serving spaces, and banquet / dining space
- Hotel retail service area
- Accessible restrooms
- Sun porch as an all-season space
- Accessible library terrace entrance
- Improved exterior court and main entrance
For the Car Shop Extension, Metal Shop, and Pavilion, we identified the following needs:
- Fiber arts classroom
- Fine arts classroom
- Workshop space for general woodworking, soldering, etc.
- Outdoor art programming space
- Accessible restrooms

With these uses in mind, our team reviewed the building’s existing drawings and documents both provided by the University and those available through online resources, historical newspapers, books, and the University of Illinois Archives. We followed this research with a site investigation, including a Matterport 3D scan to observe and document the existing conditions. This information informed our understanding of the building’s historical significance and allowed us to provide conceptual designs for building recommendations.

